← Back to the Blocks theme page Game data from IGDB.com, for demonstration only. Get the theme

Timberborn

Rating
83/100
Released
March 12, 2026
Developer
Mechanistry
Publisher
Mechanistry
Platforms
Mac, PC (Microsoft Windows)
Game modes
Single player

About this game

Humans are long gone. In a world struck by droughts and toxic waste, will your lumberpunk beavers do any better? Timberborn is a sandbox city-building game featuring ingenious animals, vertical architecture, water physics, and terraforming. Contains high amounts of wood.

Storyline

Mankind turned Earth into a dry wasteland and perished, but some species adapted and evolved. Pick one of the beaver factions and see how long your colony can last.

Trailer

Screenshots

Similar games

  • Foundation
  • Going Medieval
  • Farthest Frontier
  • Havendock
  • Captain of Industry
  • Stranded: Alien Dawn
  • Settlement Survival
  • Hotel Architect

Age ratings

  • GRAC: 12+
  • PEGI: 3
  • ESRB: E